What cut edge corrosion is
Profiled steel roof and wall sheets are cut to length, which leaves the steel at the cut edge without its protective coating. Over time the coating peels back from those edges and rust spreads along the sheet laps, where water is drawn into the overlap. Left alone, it eats into the sheet and the laps start to leak. It is one of the most common reasons warehouse and factory roofs start failing after 15–20 years.
Signs to look for
- Coating peeling back from sheet ends and laps
- Rust staining along the laps, eaves and ridge
- Drips or leaks that follow the lines of the sheet laps
- Previous patch repairs that haven't lasted
How we treat it
1. Survey
We inspect the roof, photograph every corroded lap and give you a clear report with costed options.
2. Preparation
Corroded edges are cleaned back and loose coating is removed.
3. Treatment
The Seamsil® 100 cut edge system is applied to seal the laps and edges.
4. Fixings and rooflights
Leaking bolt fixings are encapsulated with Seamsil® 400, and aged GRP rooflights can be restored with Delglaze® at the same time.
5. Guarantee
Seamsil® 100 carries a 15-year BBA-approved guarantee.
When the whole roof needs more
If the coating is failing across the whole roof, a full Delcote® coating (10 or 25-year guarantee) is usually better value than treating the edges alone. If the sheeting has corroded through to structural failure, we'll tell you honestly.
Full metal roof refurbishmentWorks around your business
No hot works and no building closure. We work while your factory or warehouse keeps operating below.
What does it cost?
Cut edge treatment is priced after a survey, mainly on the length of laps and edges to treat and on access. Full metal roof refurbishment projects typically cost £15,000 to £130,000.
See all pricesCommonly Asked Questions
Can cut edge corrosion be treated without replacing the sheets?
In most cases, yes. If the sheets are still structurally sound, treating the edges and laps stops the corrosion spreading. If they have corroded through, we'll tell you honestly.
How long does the treatment last?
Seamsil® 100 is BBA-approved for 15 years. If we also coat the whole roof, Delcote® 25 carries a 25-year product guarantee.
Do we need to close the building?
No. There are no hot works, and we work while your site keeps operating.
Do you cover my area?
We cover London, the South East, the South West and the Midlands from our offices in Windsor and Weston-super-Mare.
What Our Clients Say
“Our metal roof was corroding and leaking in multiple places. Vanguard’s coating system extended its life by at least 15 years at a fraction of the replacement cost.”
Operations Director
Industrial, Manufacturing Facility, Birmingham

